Shop Development – Foundation and Services
Lacombe County, Alberta
DHC Solutions Ltd. was contracted to construct a 46’ x 30’ engineered slab for a wood-working shop approximately 10 km west of Lacombe. Prior to building the slab, water, sewer and electrical services had to be trenched and installed. The work included:
- Stripping topsoil
- Compacting subgrade
- Trenching for water, sewer and electricity
- Coring into septic tank and installation of sewer line to shop
- Coring into house foundation and installation of water line to shop
- Installation of plumbing pipe within garage envelope for two sinks, 2 drains and a toilet
- Supply and place crushed gravel (over 150 tonnes)
- Shape and compact gravel for thickened perimeter
- Construct 12” formwork
- Rebar placement and tying