Commercial Holding Tank Installation and Site Services

SV of Poplar Bay, Pigeon Lake, Wetaskiwin County, Alberta

DHC Solutions Ltd. was engaged by a commercial builder to Design and Install a holding tank configuration for a Camp Housing and Assembly Hall. We installed dual 4400 Gallon tanks. This included installing an equalization pipe and installing the pressure-supply line from inside the building, under the footing and into the tanks as well as backfill and rough grading around the tanks. DHC Solutions Ltd. also installed the water supply line from the existing pump house to the new building and trenched and backfilled for the gas and electrical.