Shop Development – Foundation and Services

Lacombe County, Alberta

DHC Solutions Ltd. was contracted to construct a 46’ x 30’ engineered slab for a wood-working shop approximately 10 km west of Lacombe. Prior to building the slab, water, sewer and electrical services had to be trenched and installed. The work included:

  • Stripping topsoil
  • Compacting subgrade
  • Trenching for water, sewer and electricity
  • Coring into septic tank and installation of sewer line to shop
  • Coring into house foundation and installation of water line to shop
  • Installation of plumbing pipe within garage envelope for two sinks, 2 drains and a toilet
  • Supply and place crushed gravel (over 150 tonnes)
  • Shape and compact gravel for thickened perimeter
  • Construct 12” formwork
  • Rebar placement and tying